COPPER PLANT

CAT5e · CAT6 · CAT6A

Structured Cabling — CAT5e, CAT6, CAT6A — London & UK

Horizontal and backbone copper with fixed point counts, tidy dressing and certification where the package calls for it.

Free survey · Locked point schedule · Reply in one working day

Structured copper is the quiet backbone of most commercial floors: desks, APs, printers and cabinets all hang off the same plant. We build that plant so IT can patch without guessing port legends and facilities can add a desk later without opening a war with the ceiling void.

From North London we mobilise across the UK for fit-outs, refreshes and contractor packages. You get a named scope, carded engineers on the tools, and a handover that matches the quote — not a vague “cabling complete” email.

Neat blue Cat6 bundles dressed along a commercial rack rail

What's included

  • Faceplates, floor boxes and consolidation points
  • Cat5e / Cat6 / Cat6A permanent links and channel builds
  • Patch panels, cabinet looms and rear management
  • Basket, tray and trunking coordination with other trades
  • Labelling from outlet ID through to panel port
  • Copper certification packs when written into the quote

Who it's for

  • Fit-out programmes that need a clean copper fabric before IT cutover
  • Electrical and M&E packages short on Cat6 capacity
  • Occupiers refreshing floors without a full strip-out
  • Schools, clinics and offices that want one accountable copper crew

Handover

What you receive

  • Point schedule and material list locked before tools arrive

  • Every outlet ID matching the panel legend

  • Channel or permanent-link results when certification is in scope

  • Snag sheet signed off against the original count

Where it shows up

Typical contexts

  • New-build offices
  • Floor refreshes
  • Education blocks
  • Clinic fit-outs
  • Retail shells

Process

How this job runs

  1. Count the plant

    Drawings or walkthrough — we lock outlet numbers, cabinet positions and live-area constraints.

  2. Price the fabric

    Labour and copper called out separately so extras cannot hide inside a lump sum.

  3. Pull and terminate

    First and second fix with supervisor cover; night shifts when the floor is occupied.

  4. Prove the links

    Dress, label, certify if specified, then close snags against the agreed schedule.

FAQ

Service FAQ

Cat6 or Cat6A — who decides?

Your specification or IT standard decides. We install Cat5e, Cat6 or Cat6A exactly as scoped — we do not upsell category without a written change.

Will you work while the office is occupied?

Yes. We plan quiet hours, loading and security with the site. Many copper upgrades run evenings and weekends.

What if the drawing count is wrong?

We re-confirm on survey. The quote follows the locked schedule; genuine extras are written before they are pulled.

Is a survey charged?

No. Where a visit is needed to lock counts and routes, the survey is free and we respond within one working day.

Ready to lock a copper count?

Send drawings or a rough outlet schedule — free survey where needed.

CallGet Quote