CERTIFY & PROVE
FLUKE DSXPass/fail evidence for copper (and fibre when specified) — including installs we did not pull.
Written test matrix · Machine results · Archive-ready pack
If it is not measured, it is not handed over. We sell proof: copper certification, selective fibre checks, fault finding and remedial work when you authorise it. That includes plant we never installed — useful when you are closing someone else’s snags or taking a building with thin paperwork.
The deliverable is an archive pack your QS, IT lead or facilities folder can keep. No “all links fine” emails. No invented pass rates.

Handover
Written test matrix (IDs, standard, sample vs full) before we attend
Machine results — not a spreadsheet of opinions
Failed-ID list with recommended fix, if remedial is authorised
Archive-ready pack named for the project, not a generic PDF dump
Where it shows up
Process
Standard, full vs sample, fibre yes/no, and who authorises remedial work — priced from that brief.
Calibrated kit on site; results saved against the ID schedule as we go.
Only when instructed — re-terminate, re-dress, re-test that ID.
Hand over named result files suitable for PC, PQQ or facilities archive.
How we engage
Independent proof for PC, handback, or someone else’s unresolved snags.
FAQ
Where certification is specified we use Fluke DSX or equivalent calibrated equipment appropriate to the category under test.
Yes. Independent testing is a common brief — we report what the plant does, not who pulled it.
Only when the order includes remedial work. Otherwise you receive a clean failed-ID list to decide next steps.
From targeted fault-finding to full-floor certification. We price from the matrix, not a one-size day rate joke.
Send the ID list and standard — we confirm matrix and attendance window.