CERTIFY & PROVE

FLUKE DSX

Data Cabling Testing & Certification — London

Pass/fail evidence for copper (and fibre when specified) — including installs we did not pull.

Written test matrix · Machine results · Archive-ready pack

If it is not measured, it is not handed over. We sell proof: copper certification, selective fibre checks, fault finding and remedial work when you authorise it. That includes plant we never installed — useful when you are closing someone else’s snags or taking a building with thin paperwork.

The deliverable is an archive pack your QS, IT lead or facilities folder can keep. No “all links fine” emails. No invented pass rates.

Network certification tester connected to labelled patch panels

What's included

  • Fluke DSX channel or permanent-link certification when named in the brief
  • Verification testing where full certification is not required
  • Fibre attenuation checks when optical links are in scope
  • Fault finding on plant installed by others
  • Re-termination and re-test of failed IDs
  • Result files formatted for IT or main-contractor folders

Who it's for

  • Project managers chasing practical completion with open cable snags
  • Clients taking vacant possession who distrust the outgoing vendor’s paperwork
  • Contractors who need an independent test visit before PC
  • FM teams hunting intermittent drops after a floor churn

Handover

What you receive

  • Written test matrix (IDs, standard, sample vs full) before we attend

  • Machine results — not a spreadsheet of opinions

  • Failed-ID list with recommended fix, if remedial is authorised

  • Archive-ready pack named for the project, not a generic PDF dump

Where it shows up

Typical contexts

  • Practical completion
  • Landlord handbacks
  • Post-churn diagnostics
  • Independent re-test

Process

How this job runs

  1. Agree the matrix

    Standard, full vs sample, fibre yes/no, and who authorises remedial work — priced from that brief.

  2. Run the set

    Calibrated kit on site; results saved against the ID schedule as we go.

  3. Fix what failed

    Only when instructed — re-terminate, re-dress, re-test that ID.

  4. File the pack

    Hand over named result files suitable for PC, PQQ or facilities archive.

FAQ

Service FAQ

Which Fluke platform?

Where certification is specified we use Fluke DSX or equivalent calibrated equipment appropriate to the category under test.

Can you certify another company’s install?

Yes. Independent testing is a common brief — we report what the plant does, not who pulled it.

Do you always remediate failures?

Only when the order includes remedial work. Otherwise you receive a clean failed-ID list to decide next steps.

Minimum visit size?

From targeted fault-finding to full-floor certification. We price from the matrix, not a one-size day rate joke.

Need pass/fail evidence on file?

Send the ID list and standard — we confirm matrix and attendance window.

CallGet Quote